.Machine Setting:
a. Connect to 220v,50HZ,2 phase power supply
b. Connect to gas/Oxygec.The value of the pressure gauge < 0.2MPa
c.The value of the pressure gauge < 0.2MPa
Machine Running:
a. Turn on LPG/Gas valve and set fire on flame
b.Turn on Oxy valve and adjust it slightly until flames become strong.
c.Turn on the inverter, speed 17-18
d. Start production
Shutoff:
a.Turn off oxygen cylinder to cut oxygen supply
b.Shut off LPG/Gas cylinder
c.Turn off the switch buttons for motors and power
Critical points:
Machine setting is already done properly,so there is no need to adjust any valves if
nothing special happens.
Oxygen can only be supplied after fire is set on the LPG/gas
Oxygen must be shut off at least 10-15 seconds earlier than LPG/Gas
FAQ:
Q:There is an explosion sound when the machine is running
answer:1.The reason for the explosion is that there is less gas and more oxygen
2.So to reduce the oxygen, the flame should not be particularly blue
3.After the fire adjustment is completed, other valves do not need to be changed. Just adjust the main valve to switch the machine

Hot Tags: shisha tube machine, China, manufacturers, suppliers, factory, customized, wholesale, in stock, Glass Tube Proccessing Machine




